
Add to Cart
Overhead factory supplies hot-dip galvanized cable trays for floor cable trays
Product Description:
♦ High strength. strong enough to withstand short circuits. Provides strength, rigidity without additional hardware.
♦ Flexible, easy and fast installation. Design allows cable exit or entry at any point.
♦ Various hardware accessories available to fix, support and install.
♦ Low cost, special model, convenient installation and ventilation.
♦ Energy saving, light weight, wide range of sizes.
Features:
1. Easy to use
2. Durable
3. Lightweight
4. Save cost and installation time
Pictures:
Place of Origin:
Category 1. Perforated cable tray; stepped cable tray; trough type cable tray | |
Material | 1. Hot-dip galvanized steel sheet |
2. Pre-galvanized steel sheet | |
3. Stainless steel SS304 and SS316L | |
4. Aluminum, aluminum alloy | |
Specification | Thickness: 0.5 mm-2.0 mm (22-27 specifications) |
Height: 25 mm-500 mm (light, medium, heavy) | |
Width: 50 mm-1200 mm | |
Length: 2-10M (can be produced according to the specified length) | |
Surface treatment: pre-galvanized (Z80-Z275), hot-dip galvanized, powder coating | |
feature | Increase the current carrying capacity of the cable |
Takes up 25% less space than ladders | |
Hole pattern is designed to provide maximum flexibility for positioning cable ties | |
Fast installation | |
Category 2. Wire Mesh Cable Tray | |
Material | Steel wire |
Completed | A. Electro-galvanized (suitable for indoor installation) |
B. Hot-dip galvanizing (the thickness of the zinc layer is between 60 and 80um) | |
C. Stainless steel (201, 202, 304, 316, 316L) | |
size | Height: 30-150mm |
Width: 50- 600mm | |
Wire diameter: 3-6mm | |
Length: 3 meters or customized |
Features:
1. Easy to use
2. Durability
3. Light weight
4. SavingCost and installation time
FAQ:
Q1.Why choose your company?
A:We are factory directly ,so the price is lower, and the products are rich in variety and be changeable in specifications.
Q2.Whether your products do quality checking before delivery?
A: we strictly following factory's standard processing step. We do inspection on every aspect before delivery.
Q3.What about leading or shipping time?
A:The delivery time depends on quantity you ordered ,but generally within 10-15days upon receipt of advance payment